|
|
Charles Kenow, administrator of the state Office of Pipeline Safety, told reporters that a plastic pipe worked its way out of the steel T-connector, which distributed gas from a main line through two plastic pipes to the office building and a neighboring building. |
| ©2009 Minnesota Public Radio : Terms of Use |